J.E. Shekell, Inc. designed and engineered a new forced-air system to maintain a constant 72 degree environment for MultiSeal when a 30-year old boiler failed at the start of winter. After the installation, MultiSeal reported a decrease in the company’s rejection rate up to 40 percent and a noticeable reduction in energy consumption reflecting in lower utility costs along with a lowering absenteeism rate for employees.