J.E. Shekell, Inc. worked with Alcoa Corporation to design a ventilation system for the new bag house facility. This project required our fabrication shop to produce duct work and fittings along with field personnel to complete the full installation in fifteen days. This required two fabrication shifts and a single shift on the installation of the duct. The final project pressurized the new building as well as provided ambient cooling for the space.