J.E. Shekell, Inc. was awarded a bid at Logan Aluminum in Kentucky. The time frame from start to finish would be four days and the installation would be over existing steam lines and high voltage conduits. J. E. Shekell, Inc. fabricated and replaced 75′ of 66″ diameter ductwork and fittings over a four day period. This ductwork was used to exhaust moist air from a coating process into an exhaust stack outside the building.